Waste of time

General concept : Enter hours

In Cactusoft Construction, time loss is linked to the worksite and it can be documented. This gives the possibility of generating a report of time losses on worksites. For each loss of time on a worksite, you can enter:

  • The reason for the loss of time (example: missing materials)

  • Total time lost (example: 3 hours)

  • Write a note regarding wasted time (optional)