Legend of the icons in the construction timetable

Icons

Icon name

Explanation

piecejoint(300px).png

With annex (number of files)

All installation plans, attachments, engineering plans and labor information.

aconfirmer(300px).png

To be confirmed

Wait for confirmation of the workers who will be assigned.

contrat(300px).png

Contractual

Workers are paid according to the contract.

deplacerv2(300px).png

Maybe get ahead

The worksite may be moved forward in the schedule.

formation(300px).png

Training


gruev2(300px).png

Crane (subcontracting)

Use a crane on the worksite.

heure(300px).png

On time

Workers are paid by the hour.

interieur(300px).png

Inside

The worksite is located inside.

jour(300px).png

Day

Daytime schedule.

nuit(300px).png

Night

Night schedule.

supervision(300px).png

Supervision


transportv2(300px).png

Transportation

Workers need vehicles for the worksite.

travailleurhoraire(300px).png

(Number) scheduled workers: (first name)

The number of workers is assigned and confirmed for this site.

travailleurprevu(300px).png

(Number) planned workers: (first name)

The number of workers will be planned for this site.

travaux(300px).png

Works


lock(300px).png

Lock

The site is locked by a user. See : Lock/Unlock